Sintaho has established the EHS system based on best practices in accordance with existing laws and regulations and industry guidelines.
Safety first, precaution crucial, and comprehensive treatment;Scientific management, risk control, and accident prevention; People oriented, maintaining health, and life first;Environmental protection, resource conservation, and sustainable development.
Zero fatal/serious injury accident;
Zero major combustion/explosion accident;
Zero major environmental pollution accident;
Zero major traffic accident;
Zero major equipment damage accident;
Zero occupational disease accident.
The three levels’ safety training rate on induction is 100%;
The health examination rate is 100%;
The special operation certificated rate is 100%;
The correction rate of major safety hidden danger is 100%.
Hazardous waste management
Environmental emergency response
Environmental assessment and acceptance
Online environmental protection system
Emission and waste reduction
Environmental hazard investigation
Environmental education and training
Facility operation for treating “three-waste”
Online monitoring
Hazardous waste warehouse
Off-gas system
Sewage treatment station
Environmental management system
“Three simultaneities” of occupational health
Occupational health file management
Occupational hazard monitoring
Occupational health education and training
External professional organization training
Enterprise internal training
Industrial injury management
Occupational protection
Personal protective devices
Engineering protection measures
Occupational hazard reports
Employee physical examination
General health examination
Occupational health examination
Assessment and protection of high active posts
Potential risks identification
Daily/Weekly/Monthly potential risks identification
Special seasonal and others potential risks identification
Special equipment management
Safety process management and safety technology
Startup and shutdown management
Four new technologies
Change management
Special operation management
Safety management system and operating procedures
Risk classification
Safety production training and education
Project process risk assessment
Risk screening
Process demonstration and reaction heat
HAZOP analysis
Three simultaneities
Emergency management
Safety culture
Contractor management